Novel Bo Hu 1 Solar (CSG)

Novel Bo Hu 1 Solar (CSG) is a 1 MW solar farm in Rice County, Minnesota, operated by Novel Bo Hu 1 Solar LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1 MW
1 MW net summer
Generating units
1
In service
2026
EIA plant ID
65006

Where it is

Loading map…
County
Rice County, Minnesota
Coordinates
44.4155, -93.1544
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Novel Bo Hu 1 Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Novel Bo Hu 1 Solar LLC reports to EIA →

Novel Bo Hu 1 Solar (CSG): FAQ

Where is Novel Bo Hu 1 Solar (CSG)?
In Rice County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Novel Bo Hu 1 Solar (CSG)?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Novel Bo Hu 1 Solar (CSG)?
EIA-860M names Novel Bo Hu 1 Solar LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Novel Bo Hu 1 Solar (CSG) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Novel Bo Hu 1 Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Novel Bo Hu 1 Solar (CSG) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Novel Bo Hu 1 Solar (CSG) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.