Timmerman (CSG)

Timmerman (CSG) is a 1 MW solar farm in Lyon County, Minnesota, operated by Elora LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1 MW
1 MW net summer
Generating units
1
In service
2022
EIA plant ID
65974

Where it is

Loading map…
County
Lyon County, Minnesota
Coordinates
44.2346, -95.8813
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Elora LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Elora LLC reports to EIA →

Timmerman (CSG): FAQ

Where is Timmerman (CSG)?
In Lyon County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Timmerman (CSG)?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Timmerman (CSG)?
EIA-860M names Elora LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Timmerman (CSG) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Elora LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Timmerman (CSG) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Timmerman (CSG) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.