Grand Meadow (PV)

Grand Meadow (PV) is a 3 MW solar farm in Mower County, Minnesota, operated by OneEnergy, Inc.. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3 MW
3 MW net summer
Generating units
1
In service
2025
EIA plant ID
69489

Where it is

Loading map…
County
Mower County, Minnesota
Coordinates
43.6594, -92.577
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
OneEnergy, Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant OneEnergy, Inc. reports to EIA →

Grand Meadow (PV): FAQ

Where is Grand Meadow (PV)?
In Mower County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Grand Meadow (PV)?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Grand Meadow (PV)?
EIA-860M names OneEnergy, Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Grand Meadow (PV) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — OneEnergy, Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Grand Meadow (PV) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Grand Meadow (PV) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.