Jicarilla Solar 2

Jicarilla Solar 2 is a 50 MW solar farm in Rio Arriba County, New Mexico, operated by Repsol Renewables NA. EIA-860M lists 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
50 MW
50 MW net summer
Generating units
1
In service
2023
EIA plant ID
65103

Where it is

Loading map…
County
Rio Arriba County, New Mexico
Coordinates
36.1411, -107.1712
Balancing authority
PNM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Repsol Renewables NA
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Repsol Renewables NA reports to EIA →

Jicarilla Solar 2: FAQ

Where is Jicarilla Solar 2?
In Rio Arriba County, New Mexico (NM). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Jicarilla Solar 2?
50 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Jicarilla Solar 2?
EIA-860M names Repsol Renewables NA as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Jicarilla Solar 2 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Repsol Renewables NA here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Jicarilla Solar 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Jicarilla Solar 2 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.