Jicarilla Solar 1 LLC
Jicarilla Solar 1 LLC is a 70 MW solar farm in Rio Arriba County, New Mexico, operated by Repsol Renewables NA. It has 2 generating units here. Its units entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 70 MW
- 70 MW net summer
- Generating units
- 2
- In service
- 2023
- Plant code
- 66163
Where it is
Loading map…
- County
- Rio Arriba County, New Mexico
- Coordinates
- 36.3167, -107.2776
- Balancing authority
- PNM
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Repsol Renewables NA
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 50 MW, Battery 20 MW. It is listed here under Solar, the energy source with the most capacity.
Jicarilla Solar 1 LLC: FAQ
- Where is Jicarilla Solar 1 LLC?
- In Rio Arriba County, New Mexico (NM). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Jicarilla Solar 1 LLC?
- 70 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Jicarilla Solar 1 LLC?
- Repsol Renewables NA is the operator of record. That is not always the ultimate owner.
- Is Jicarilla Solar 1 LLC still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.