Jicarilla Solar 1 LLC
Jicarilla Solar 1 LLC is a 70 MW solar farm in Rio Arriba County, New Mexico, operated by Repsol Renewables NA. EIA-860M lists 2 generating units here. Its units entered service in 2023.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 70 MW
- 70 MW net summer
- Generating units
- 2
- In service
- 2023
- EIA plant ID
- 66163
Where it is
Loading map…
- County
- Rio Arriba County, New Mexico
- Coordinates
- 36.3167, -107.2776
- Balancing authority
- PNM
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Repsol Renewables NA
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Solar 50 MW, Battery 20 MW. It is filed here under Solar, the source with the most capacity.
Jicarilla Solar 1 LLC: FAQ
- Where is Jicarilla Solar 1 LLC?
- In Rio Arriba County, New Mexico (NM). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Jicarilla Solar 1 LLC?
- 70 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Jicarilla Solar 1 LLC?
- EIA-860M names Repsol Renewables NA as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is Jicarilla Solar 1 LLC still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.