Progress Solar II, LLC

Progress Solar II, LLC is a 4 MW solar farm in Robeson County, North Carolina, operated by Oppidum Renewables USA, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2012.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.5 MW
3.5 MW net summer
Generating units
1
In service
2012
EIA plant ID
58494

Where it is

Loading map…
County
Robeson County, North Carolina
Coordinates
34.4761, -79.0975
Balancing authority
CPLE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Oppidum Renewables USA, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Oppidum Renewables USA, LLC reports to EIA →

Progress Solar II, LLC: FAQ

Where is Progress Solar II, LLC?
In Robeson County, North Carolina (NC). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Progress Solar II, LLC?
4 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Progress Solar II, LLC?
EIA-860M names Oppidum Renewables USA, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is Progress Solar II, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.