Camp Lejeune Solar and Energy Storage

Camp Lejeune Solar and Energy Storage is a 13 MW solar farm in Onslow County, North Carolina, operated by Duke Energy Progress - (NC). EIA-860M lists 1 generating unit here. Its unit entered service in 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
12.8 MW
12.8 MW net summer
Generating units
1
In service
2015
EIA plant ID
59966

Where it is

Loading map…
County
Onslow County, North Carolina
Coordinates
34.7257, -77.3503
Balancing authority
DUK
Sector
Electric Utility

Units, technology and status

Operator of record
Duke Energy Progress - (NC)
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Duke Energy Progress - (NC) reports to EIA →

Camp Lejeune Solar and Energy Storage: FAQ

Where is Camp Lejeune Solar and Energy Storage?
In Onslow County, North Carolina (NC). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Camp Lejeune Solar and Energy Storage?
13 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Camp Lejeune Solar and Energy Storage?
EIA-860M names Duke Energy Progress - (NC) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Camp Lejeune Solar and Energy Storage LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Duke Energy Progress - (NC) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Camp Lejeune Solar and Energy Storage LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Camp Lejeune Solar and Energy Storage still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.