Two Mile Desert Project

Two Mile Desert Project is a 16 MW solar farm in Perquimans County, North Carolina, operated by Citizens Enterprises Corporation. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
16.2 MW
16.2 MW net summer
Generating units
1
In service
2019
EIA plant ID
60510

Where it is

Loading map…
County
Perquimans County, North Carolina
Coordinates
36.22, -76.46
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Citizens Enterprises Corporation
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Citizens Enterprises Corporation reports to EIA →

Two Mile Desert Project: FAQ

Where is Two Mile Desert Project?
In Perquimans County, North Carolina (NC). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Two Mile Desert Project?
16 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Two Mile Desert Project?
EIA-860M names Citizens Enterprises Corporation as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Two Mile Desert Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Citizens Enterprises Corporation here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Two Mile Desert Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Two Mile Desert Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.