Salt City Solar Project - Hybrid

Salt City Solar Project - Hybrid is a 50 MW solar farm in Ross County, Ohio, operated by Salt City Solar LLC. It has 1 generating unit here, inside PJM. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
49.9 MW
49.9 MW net summer
Generating units
1
In service
2023
Plant code
65302

Where it is

Loading map…
County
Ross County, Ohio
Coordinates
39.4147, -82.9628
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Salt City Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Salt City Solar Project - Hybrid: FAQ

Where is Salt City Solar Project - Hybrid?
In Ross County, Ohio (OH). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Salt City Solar Project - Hybrid?
50 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Salt City Solar Project - Hybrid?
Salt City Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Salt City Solar Project - Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Salt City Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Salt City Solar Project - Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Salt City Solar Project - Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.