Timber Road Solar Park

Timber Road Solar Park is a 50 MW solar farm in Paulding County, Ohio, operated by Timber Road Solar Park. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
49.9 MW
49.9 MW net summer
Generating units
1
In service
2023
EIA plant ID
66250

Where it is

Loading map…
County
Paulding County, Ohio
Coordinates
41.0923, -84.7257
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Timber Road Solar Park
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Timber Road Solar Park reports to EIA →

Timber Road Solar Park: FAQ

Where is Timber Road Solar Park?
In Paulding County, Ohio (OH). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Timber Road Solar Park?
50 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Timber Road Solar Park?
EIA-860M names Timber Road Solar Park as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Timber Road Solar Park LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Timber Road Solar Park here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Timber Road Solar Park LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Timber Road Solar Park still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.