Jordan Energy-DFA Middlebury Center Plan

Jordan Energy-DFA Middlebury Center Plan is a 1 MW solar farm in Tioga County, Pennsylvania, operated by Distributed Solar Development, LLC. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.1 MW
1.1 MW net summer
Generating units
1
In service
2021
EIA plant ID
66730

Where it is

Loading map…
County
Tioga County, Pennsylvania
Coordinates
41.838, -77.2759
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Distributed Solar Development, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Distributed Solar Development, LLC reports to EIA →

Jordan Energy-DFA Middlebury Center Plan: FAQ

Where is Jordan Energy-DFA Middlebury Center Plan?
In Tioga County, Pennsylvania (PA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Jordan Energy-DFA Middlebury Center Plan?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Jordan Energy-DFA Middlebury Center Plan?
EIA-860M names Distributed Solar Development, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Jordan Energy-DFA Middlebury Center Plan LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Distributed Solar Development, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Jordan Energy-DFA Middlebury Center Plan LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Jordan Energy-DFA Middlebury Center Plan still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.