Blairs Valley Solar Project

Blairs Valley Solar Project is a 20 MW solar farm in Franklin County, Pennsylvania, operated by CleanChoice Energy. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
20 MW
20 MW net summer
Generating units
1
In service
2025
EIA plant ID
69235

Where it is

Loading map…
County
Franklin County, Pennsylvania
Coordinates
39.8034, -77.9216
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
CleanChoice Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant CleanChoice Energy reports to EIA →

Blairs Valley Solar Project: FAQ

Where is Blairs Valley Solar Project?
In Franklin County, Pennsylvania (PA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Blairs Valley Solar Project?
20 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Blairs Valley Solar Project?
EIA-860M names CleanChoice Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Blairs Valley Solar Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — CleanChoice Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Blairs Valley Solar Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Blairs Valley Solar Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.