Lily Solar

Lily Solar is a 70 MW solar farm in Allendale County, South Carolina, operated by X-Elio North America Inc. EIA-860M lists 1 generating unit here. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
70 MW
70 MW net summer
Generating units
1
In service
2020
EIA plant ID
63548

Where it is

Loading map…
County
Allendale County, South Carolina
Coordinates
33.0949, -81.4348
Balancing authority
SCEG
Sector
IPP Non-CHP

Units, technology and status

Operator of record
X-Elio North America Inc
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant X-Elio North America Inc reports to EIA →

Lily Solar: FAQ

Where is Lily Solar?
In Allendale County, South Carolina (SC). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Lily Solar?
70 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Lily Solar?
EIA-860M names X-Elio North America Inc as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Lily Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — X-Elio North America Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Lily Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Lily Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.