Chattanooga Metropolitan Airport Solar

Chattanooga Metropolitan Airport Solar is a 3 MW solar farm in Hamilton County, Tennessee, operated by Chattanooga Metropolitan Airport. EIA-860M lists 3 generating units here. Its units entered service between 2011 and 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2.5 MW
1.9 MW net summer
Generating units
3
In service
2011–2019
EIA plant ID
58515

Where it is

Loading map…
County
Hamilton County, Tennessee
Coordinates
35.0246, -85.2086
Balancing authority
TVA
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
Chattanooga Metropolitan Airport
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Chattanooga Metropolitan Airport reports to EIA →

Chattanooga Metropolitan Airport Solar: FAQ

Where is Chattanooga Metropolitan Airport Solar?
In Hamilton County, Tennessee (TN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Chattanooga Metropolitan Airport Solar?
3 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns Chattanooga Metropolitan Airport Solar?
EIA-860M names Chattanooga Metropolitan Airport as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Chattanooga Metropolitan Airport Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Chattanooga Metropolitan Airport here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Chattanooga Metropolitan Airport Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Chattanooga Metropolitan Airport Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.