Chattanooga Metropolitan Airport Solar
Chattanooga Metropolitan Airport Solar is a 3 MW solar farm in Hamilton County, Tennessee, operated by Chattanooga Metropolitan Airport. EIA-860M lists 3 generating units here. Its units entered service between 2011 and 2019.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 2.5 MW
- 1.9 MW net summer
- Generating units
- 3
- In service
- 2011–2019
- EIA plant ID
- 58515
Where it is
Loading map…
- County
- Hamilton County, Tennessee
- Coordinates
- 35.0246, -85.2086
- Balancing authority
- TVA
- Sector
- Commercial Non-CHP
Units, technology and status
- Operator of record
- Chattanooga Metropolitan Airport
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Every plant Chattanooga Metropolitan Airport reports to EIA →
Chattanooga Metropolitan Airport Solar: FAQ
- Where is Chattanooga Metropolitan Airport Solar?
- In Hamilton County, Tennessee (TN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Chattanooga Metropolitan Airport Solar?
- 3 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
- Who owns Chattanooga Metropolitan Airport Solar?
- EIA-860M names Chattanooga Metropolitan Airport as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Chattanooga Metropolitan Airport Solar LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Chattanooga Metropolitan Airport here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Chattanooga Metropolitan Airport Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Chattanooga Metropolitan Airport Solar still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.