Hornshadow Solar II, LLC

Hornshadow Solar II, LLC is a 200 MW solar farm in Emery County, Utah, operated by Hornshadow Solar II, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
200 MW
200 MW net summer
Generating units
1
In service
2025
EIA plant ID
67511

Where it is

Loading map…
County
Emery County, Utah
Coordinates
39.1824, -110.9772
Balancing authority
PACE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Hornshadow Solar II, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Hornshadow Solar II, LLC reports to EIA →

Hornshadow Solar II, LLC: FAQ

Where is Hornshadow Solar II, LLC?
In Emery County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Hornshadow Solar II, LLC?
200 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Hornshadow Solar II, LLC?
EIA-860M names Hornshadow Solar II, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is Hornshadow Solar II, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.