Hornshadow Solar II, LLC
Hornshadow Solar II, LLC is a 200 MW solar farm in Emery County, Utah, operated by Hornshadow Solar II, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2025.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 200 MW
- 200 MW net summer
- Generating units
- 1
- In service
- 2025
- EIA plant ID
- 67511
Where it is
Loading map…
- County
- Emery County, Utah
- Coordinates
- 39.1824, -110.9772
- Balancing authority
- PACE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Hornshadow Solar II, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Hornshadow Solar II, LLC: FAQ
- Where is Hornshadow Solar II, LLC?
- In Emery County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Hornshadow Solar II, LLC?
- 200 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Hornshadow Solar II, LLC?
- EIA-860M names Hornshadow Solar II, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is Hornshadow Solar II, LLC still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.