GMP Solar/Storage-Ferrisburgh Hybrid

GMP Solar/Storage-Ferrisburgh Hybrid is a 7 MW solar farm in Addison County, Vermont, operated by Green Mountain Power Corp. EIA-860M lists 2 generating units here, inside ISO New England. Its units entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
7 MW
7 MW net summer
Generating units
2
In service
2019
EIA plant ID
62382

Where it is

Loading map…
County
Addison County, Vermont
Coordinates
44.1334, -73.1441
Balancing authority
ISNE
Sector
Electric Utility

Units, technology and status

Operator of record
Green Mountain Power Corp
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 5 MW, Battery 2 MW. It is filed here under Solar, the source with the most capacity.

Every plant Green Mountain Power Corp reports to EIA →

GMP Solar/Storage-Ferrisburgh Hybrid: FAQ

Where is GMP Solar/Storage-Ferrisburgh Hybrid?
In Addison County, Vermont (VT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is GMP Solar/Storage-Ferrisburgh Hybrid?
7 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns GMP Solar/Storage-Ferrisburgh Hybrid?
EIA-860M names Green Mountain Power Corp as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as GMP Solar/Storage-Ferrisburgh Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Green Mountain Power Corp here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "GMP Solar/Storage-Ferrisburgh Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is GMP Solar/Storage-Ferrisburgh Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.