Sunnybrook Solar Project - Hybrid

Sunnybrook Solar Project - Hybrid is a 51 MW solar farm in Halifax County, Virginia, operated by Sunnybrook Farm Solar, LLC. It has 1 generating unit here, inside PJM. Its unit entered service in 2022.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
51 MW
51 MW net summer
Generating units
1
In service
2022
Plant code
65307

Where it is

Loading map…
County
Halifax County, Virginia
Coordinates
36.7987, -78.8396
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Sunnybrook Farm Solar, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Sunnybrook Solar Project - Hybrid: FAQ

Where is Sunnybrook Solar Project - Hybrid?
In Halifax County, Virginia (VA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Sunnybrook Solar Project - Hybrid?
51 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Sunnybrook Solar Project - Hybrid?
Sunnybrook Farm Solar, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Sunnybrook Solar Project - Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Sunnybrook Farm Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sunnybrook Solar Project - Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Sunnybrook Solar Project - Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.