Solidago Solar
Solidago Solar is a 20 MW solar farm in Isle of Wight County, Virginia, operated by Dominion Energy Inc.. It has 1 generating unit here, inside PJM. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 20 MW
- 20 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 66999
Where it is
Loading map…
- County
- Isle of Wight County, Virginia
- Coordinates
- 36.89, -76.71
- Balancing authority
- PJM
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Dominion Energy Inc.
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Solidago Solar: FAQ
- Where is Solidago Solar?
- In Isle of Wight County, Virginia (VA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Solidago Solar?
- 20 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Solidago Solar?
- Dominion Energy Inc. is the operator of record. That is not always the ultimate owner.
- Is this the same as Solidago Solar LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Dominion Energy Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Solidago Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Solidago Solar still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.