Badger Hollow II

Badger Hollow II is a 150 MW solar farm in Iowa County, Wisconsin, operated by Wisconsin Electric Power Co. It has 1 generating unit here, inside MISO. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
150 MW
150 MW net summer
Generating units
1
In service
2023
Plant code
64393

Where it is

Loading map…
County
Iowa County, Wisconsin
Coordinates
42.9456, -90.3494
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
Wisconsin Electric Power Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Wisconsin Electric Power Co →

Badger Hollow II: FAQ

Where is Badger Hollow II?
In Iowa County, Wisconsin (WI). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Badger Hollow II?
150 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Badger Hollow II?
Wisconsin Electric Power Co is the operator of record. That is not always the ultimate owner.
Is this the same as Badger Hollow II LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Wisconsin Electric Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Badger Hollow II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Badger Hollow II still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.