Badger Hollow II

Badger Hollow II is a 150 MW solar farm in Iowa County, Wisconsin, operated by Wisconsin Electric Power Co. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
150 MW
150 MW net summer
Generating units
1
In service
2023
EIA plant ID
64393

Where it is

Loading map…
County
Iowa County, Wisconsin
Coordinates
42.9456, -90.3494
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
Wisconsin Electric Power Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Wisconsin Electric Power Co reports to EIA →

Badger Hollow II: FAQ

Where is Badger Hollow II?
In Iowa County, Wisconsin (WI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Badger Hollow II?
150 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Badger Hollow II?
EIA-860M names Wisconsin Electric Power Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Badger Hollow II LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Wisconsin Electric Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Badger Hollow II LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Badger Hollow II still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.