Shiloh III Wind Project LLC

Shiloh III Wind Project LLC is a 103 MW wind farm in Solano County, California, operated by EDF Renewable Asset Holdings, Inc.. It has 1 generating unit here, inside CAISO. Its unit entered service in 2011.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
102.5 MW
102.5 MW net summer
Generating units
1
In service
2011
Plant code
57586

Where it is

Loading map…
County
Solano County, California
Coordinates
38.1694, -121.8469
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
EDF Renewable Asset Holdings, Inc.
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant operated by EDF Renewable Asset Holdings, Inc. →

Shiloh III Wind Project LLC: FAQ

Where is Shiloh III Wind Project LLC?
In Solano County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Shiloh III Wind Project LLC?
103 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Shiloh III Wind Project LLC?
EDF Renewable Asset Holdings, Inc. is the operator of record. That is not always the ultimate owner.
Is Shiloh III Wind Project LLC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.