Golden Hills North Wind Energy Center

Golden Hills North Wind Energy Center is a 46 MW wind farm in Alameda County, California, operated by Golden Hills Interconnection Wind, LLC. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2017.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
46 MW
46 MW net summer
Generating units
1
In service
2017
EIA plant ID
61222

Where it is

Loading map…
County
Alameda County, California
Coordinates
37.7692, -121.6302
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Golden Hills Interconnection Wind, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Golden Hills Interconnection Wind, LLC reports to EIA →

Golden Hills North Wind Energy Center: FAQ

Where is Golden Hills North Wind Energy Center?
In Alameda County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Golden Hills North Wind Energy Center?
46 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Golden Hills North Wind Energy Center?
EIA-860M names Golden Hills Interconnection Wind, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Golden Hills North Wind Energy Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Golden Hills Interconnection Wind, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Golden Hills North Wind Energy Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Golden Hills North Wind Energy Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.