Bennington Wind

Bennington Wind is a 93 MW wind farm in Marshall County, Illinois, operated by Minonk Stewardship Wind LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
93 MW
93 MW net summer
Generating units
1
In service
2021
EIA plant ID
63384

Where it is

Loading map…
County
Marshall County, Illinois
Coordinates
40.9604, -89.0854
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Minonk Stewardship Wind LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Minonk Stewardship Wind LLC reports to EIA →

Bennington Wind: FAQ

Where is Bennington Wind?
In Marshall County, Illinois (IL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Bennington Wind?
93 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Bennington Wind?
EIA-860M names Minonk Stewardship Wind LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Bennington Wind LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Minonk Stewardship Wind LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Bennington Wind LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Bennington Wind still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.