Shady Oaks Wind 2

Shady Oaks Wind 2 is a 108 MW wind farm in Lee County, Illinois, operated by Shady Oaks Wind 2, LLC. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
108.3 MW
108.3 MW net summer
Generating units
1
In service
2023
EIA plant ID
66568

Where it is

Loading map…
County
Lee County, Illinois
Coordinates
41.6665, -89.0598
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Shady Oaks Wind 2, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Shady Oaks Wind 2, LLC reports to EIA →

Shady Oaks Wind 2: FAQ

Where is Shady Oaks Wind 2?
In Lee County, Illinois (IL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Shady Oaks Wind 2?
108 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Shady Oaks Wind 2?
EIA-860M names Shady Oaks Wind 2, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Shady Oaks Wind 2 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Shady Oaks Wind 2, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Shady Oaks Wind 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Shady Oaks Wind 2 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.