FPL Energy Crystal Lake Wind II LLC

FPL Energy Crystal Lake Wind II LLC is a 200 MW wind farm in Hancock County, Iowa, operated by FPL Energy Crystal Lake Wind II LLC. It has 1 generating unit here, inside MISO. Its unit entered service in 2009.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
200 MW
199 MW net summer
Generating units
1
In service
2009
Plant code
56925

Where it is

Loading map…
County
Hancock County, Iowa
Coordinates
43.2737, -93.8
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
FPL Energy Crystal Lake Wind II LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

FPL Energy Crystal Lake Wind II LLC: FAQ

Where is FPL Energy Crystal Lake Wind II LLC?
In Hancock County, Iowa (IA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is FPL Energy Crystal Lake Wind II LLC?
200 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns FPL Energy Crystal Lake Wind II LLC?
FPL Energy Crystal Lake Wind II LLC is the operator of record. That is not always the ultimate owner.
Is FPL Energy Crystal Lake Wind II LLC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.