FPL Energy Crystal Lake Wind II LLC

FPL Energy Crystal Lake Wind II LLC is a 200 MW wind farm in Hancock County, Iowa, operated by FPL Energy Crystal Lake Wind II LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2009.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
200 MW
199 MW net summer
Generating units
1
In service
2009
EIA plant ID
56925

Where it is

Loading map…
County
Hancock County, Iowa
Coordinates
43.2737, -93.8
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
FPL Energy Crystal Lake Wind II LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant FPL Energy Crystal Lake Wind II LLC reports to EIA →

FPL Energy Crystal Lake Wind II LLC: FAQ

Where is FPL Energy Crystal Lake Wind II LLC?
In Hancock County, Iowa (IA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is FPL Energy Crystal Lake Wind II LLC?
200 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns FPL Energy Crystal Lake Wind II LLC?
EIA-860M names FPL Energy Crystal Lake Wind II LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is FPL Energy Crystal Lake Wind II LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.