Ivester Wind Farm

Ivester Wind Farm is a 91 MW wind farm in Grundy County, Iowa, operated by MidAmerican Energy Co. It has 1 generating unit here, inside MISO. Its unit entered service in 2018.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
90.8 MW
90 MW net summer
Generating units
1
In service
2018
Plant code
61911

Where it is

Loading map…
County
Grundy County, Iowa
Coordinates
42.3333, -92.9464
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
MidAmerican Energy Co
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant operated by MidAmerican Energy Co →

Ivester Wind Farm: FAQ

Where is Ivester Wind Farm?
In Grundy County, Iowa (IA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Ivester Wind Farm?
91 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Ivester Wind Farm?
MidAmerican Energy Co is the operator of record. That is not always the ultimate owner.
Is this the same as Ivester Wind Farm LLC?
Probably, but the plant data does not say. It records a plant name and an operator — MidAmerican Energy Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Ivester Wind Farm LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Ivester Wind Farm still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.