Great Pathfinder Wind

Great Pathfinder Wind is a 224 MW wind farm in Hamilton County, Iowa, operated by Great Pathfinder Wind. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
224.4 MW
224.4 MW net summer
Generating units
1
In service
2023
EIA plant ID
65715

Where it is

Loading map…
County
Hamilton County, Iowa
Coordinates
42.2141, -93.8767
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Great Pathfinder Wind
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Great Pathfinder Wind reports to EIA →

Great Pathfinder Wind: FAQ

Where is Great Pathfinder Wind?
In Hamilton County, Iowa (IA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Great Pathfinder Wind?
224 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Great Pathfinder Wind?
EIA-860M names Great Pathfinder Wind as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Great Pathfinder Wind LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Great Pathfinder Wind here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Great Pathfinder Wind LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Great Pathfinder Wind still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.