Greenback Energy

Greenback Energy is a 2 MW wind farm in Pipestone County, Minnesota, operated by Greenback Energy, LLC (Longroad). It has 1 generating unit here, inside MISO. Its unit entered service in 2004.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.7 MW
1.7 MW net summer
Generating units
1
In service
2004
Plant code
56413

Where it is

Loading map…
County
Pipestone County, Minnesota
Coordinates
44.0208, -96.4331
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Greenback Energy, LLC (Longroad)
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Greenback Energy: FAQ

Where is Greenback Energy?
In Pipestone County, Minnesota (MN). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Greenback Energy?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Greenback Energy?
Greenback Energy, LLC (Longroad) is the operator of record. That is not always the ultimate owner.
Is this the same as Greenback Energy LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Greenback Energy, LLC (Longroad) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Greenback Energy LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Greenback Energy still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.