Bent Tree Wind Farm Phase 1

Bent Tree Wind Farm Phase 1 is a 201 MW wind farm in Freeborn County, Minnesota, operated by Wisconsin Power & Light Co. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2011.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
201.3 MW
201.3 MW net summer
Generating units
1
In service
2011
EIA plant ID
57198

Where it is

Loading map…
County
Freeborn County, Minnesota
Coordinates
43.7246, -93.4504
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
Wisconsin Power & Light Co
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Wisconsin Power & Light Co reports to EIA →

Bent Tree Wind Farm Phase 1: FAQ

Where is Bent Tree Wind Farm Phase 1?
In Freeborn County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Bent Tree Wind Farm Phase 1?
201 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Bent Tree Wind Farm Phase 1?
EIA-860M names Wisconsin Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Bent Tree Wind Farm Phase 1 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Wisconsin Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Bent Tree Wind Farm Phase 1 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Bent Tree Wind Farm Phase 1 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.