UMM Wind Turbine
UMM Wind Turbine is a 2 MW wind farm in Stevens County, Minnesota, operated by University of Minnesota Morris Campus. It has 1 generating unit here, inside MISO. Its unit entered service in 2011.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 1.7 MW
- 0.6 MW net summer
- Generating units
- 1
- In service
- 2011
- Plant code
- 57732
Where it is
Loading map…
- County
- Stevens County, Minnesota
- Coordinates
- 45.5897, -95.877
- Balancing authority
- MISO
- Sector
- Commercial Non-CHP
Units, technology and status
- Operator of record
- University of Minnesota Morris Campus
- Primary energy source
- Wind
- Technologies
- Onshore Wind Turbine
- Status
- Operating
UMM Wind Turbine: FAQ
- Where is UMM Wind Turbine?
- In Stevens County, Minnesota (MN). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is UMM Wind Turbine?
- 2 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns UMM Wind Turbine?
- University of Minnesota Morris Campus is the operator of record. That is not always the ultimate owner.
- Is this the same as UMM Wind Turbine LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — University of Minnesota Morris Campus here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "UMM Wind Turbine LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is UMM Wind Turbine still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.