UMM Wind Turbine

UMM Wind Turbine is a 2 MW wind farm in Stevens County, Minnesota, operated by University of Minnesota Morris Campus. It has 1 generating unit here, inside MISO. Its unit entered service in 2011.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.7 MW
0.6 MW net summer
Generating units
1
In service
2011
Plant code
57732

Where it is

Loading map…
County
Stevens County, Minnesota
Coordinates
45.5897, -95.877
Balancing authority
MISO
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
University of Minnesota Morris Campus
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

UMM Wind Turbine: FAQ

Where is UMM Wind Turbine?
In Stevens County, Minnesota (MN). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is UMM Wind Turbine?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns UMM Wind Turbine?
University of Minnesota Morris Campus is the operator of record. That is not always the ultimate owner.
Is this the same as UMM Wind Turbine LLC?
Probably, but the plant data does not say. It records a plant name and an operator — University of Minnesota Morris Campus here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "UMM Wind Turbine LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is UMM Wind Turbine still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.