Casa Mesa Wind Energy Center Hybrid

Casa Mesa Wind Energy Center Hybrid is a 52 MW wind farm in Quay County, New Mexico, operated by Casa Mesa Wind, LLC. EIA-860M lists 2 generating units here. Its units entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
51.9 MW
51.9 MW net summer
Generating units
2
In service
2018
EIA plant ID
61925

Where it is

Loading map…
County
Quay County, New Mexico
Coordinates
34.605, -103.9661
Balancing authority
PNM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Casa Mesa Wind, LLC
Primary energy source
Wind
Technologies
Batteries, Onshore Wind Turbine
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Wind 51 MW, Battery 1 MW. It is filed here under Wind, the source with the most capacity.

Every plant Casa Mesa Wind, LLC reports to EIA →

Casa Mesa Wind Energy Center Hybrid: FAQ

Where is Casa Mesa Wind Energy Center Hybrid?
In Quay County, New Mexico (NM). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Casa Mesa Wind Energy Center Hybrid?
52 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Casa Mesa Wind Energy Center Hybrid?
EIA-860M names Casa Mesa Wind, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Casa Mesa Wind Energy Center Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Casa Mesa Wind, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Casa Mesa Wind Energy Center Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Casa Mesa Wind Energy Center Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.