FPL Energy Oliver Wind II LLC

FPL Energy Oliver Wind II LLC is a 48 MW wind farm in Oliver County, North Dakota, operated by FPL Energy Oliver County Wind II LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2007.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
48 MW
48 MW net summer
Generating units
1
In service
2007
EIA plant ID
56573

Where it is

Loading map…
County
Oliver County, North Dakota
Coordinates
47.1528, -101.1977
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
FPL Energy Oliver County Wind II LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant FPL Energy Oliver County Wind II LLC reports to EIA →

FPL Energy Oliver Wind II LLC: FAQ

Where is FPL Energy Oliver Wind II LLC?
In Oliver County, North Dakota (ND). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is FPL Energy Oliver Wind II LLC?
48 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns FPL Energy Oliver Wind II LLC?
EIA-860M names FPL Energy Oliver County Wind II LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is FPL Energy Oliver Wind II LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.