Merricourt Wind Energy Center

Merricourt Wind Energy Center is a 150 MW wind farm in McIntosh County, North Dakota, operated by Otter Tail Power Co. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
150 MW
150 MW net summer
Generating units
1
In service
2020
EIA plant ID
57048

Where it is

Loading map…
County
McIntosh County, North Dakota
Coordinates
46.1075, -99.0592
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
Otter Tail Power Co
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Otter Tail Power Co reports to EIA →

Merricourt Wind Energy Center: FAQ

Where is Merricourt Wind Energy Center?
In McIntosh County, North Dakota (ND). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Merricourt Wind Energy Center?
150 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Merricourt Wind Energy Center?
EIA-860M names Otter Tail Power Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Merricourt Wind Energy Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Otter Tail Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Merricourt Wind Energy Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Merricourt Wind Energy Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.