Bison 2 Wind Energy Center

Bison 2 Wind Energy Center is a 105 MW wind farm in Morton County, North Dakota, operated by ALLETE, Inc.. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2012.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
105 MW
105 MW net summer
Generating units
1
In service
2012
EIA plant ID
57800

Where it is

Loading map…
County
Morton County, North Dakota
Coordinates
46.98, -101.5547
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
ALLETE, Inc.
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant ALLETE, Inc. reports to EIA →

Bison 2 Wind Energy Center: FAQ

Where is Bison 2 Wind Energy Center?
In Morton County, North Dakota (ND). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Bison 2 Wind Energy Center?
105 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Bison 2 Wind Energy Center?
EIA-860M names ALLETE, Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Bison 2 Wind Energy Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — ALLETE, Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Bison 2 Wind Energy Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Bison 2 Wind Energy Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.