Klondike Windpower III
Klondike Windpower III is a 298 MW wind farm in Sherman County, Oregon, operated by Avangrid Power LLC. EIA-860M lists 2 generating units here. Its units entered service between 2007 and 2008.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 297.5 MW
- 297.5 MW net summer
- Generating units
- 2
- In service
- 2007–2008
- EIA plant ID
- 56468
Where it is
Loading map…
- County
- Sherman County, Oregon
- Coordinates
- 45.5836, -120.5042
- Balancing authority
- AVRN
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Avangrid Power LLC
- Primary energy source
- Wind
- Technologies
- Onshore Wind Turbine
- Status
- Operating
Klondike Windpower III: FAQ
- Where is Klondike Windpower III?
- In Sherman County, Oregon (OR). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Klondike Windpower III?
- 298 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Klondike Windpower III?
- EIA-860M names Avangrid Power LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Klondike Windpower III LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Avangrid Power LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Klondike Windpower III LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Klondike Windpower III still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.