WED Coventry 1
WED Coventry 1 is a 2 MW wind farm in Kent County, Rhode Island, operated by WED Coventry One, LLC. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2016.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 1.5 MW
- 1.5 MW net summer
- Generating units
- 1
- In service
- 2016
- EIA plant ID
- 59301
Where it is
Loading map…
- County
- Kent County, Rhode Island
- Coordinates
- 41.6758, -71.7075
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- WED Coventry One, LLC
- Primary energy source
- Wind
- Technologies
- Onshore Wind Turbine
- Status
- Operating
WED Coventry 1: FAQ
- Where is WED Coventry 1?
- In Kent County, Rhode Island (RI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is WED Coventry 1?
- 2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns WED Coventry 1?
- EIA-860M names WED Coventry One, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as WED Coventry 1 LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — WED Coventry One, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "WED Coventry 1 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is WED Coventry 1 still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.