Wind Farms in Rhode Island

Every operating wind farm in Rhode Island on EIA-860M for 2026-07: 19 plants, 23 turbine strings and 78 MW of nameplate capacity across 4 counties, most of it inside ISO New England.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
19
23 generating units
Nameplate capacity
78 MW
Counties
4
Grid operator
ISO New England
covers most of these plants

Map of wind farms in Rhode Island

Every one of the 19 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Wind · 19

List of wind farms in Rhode Island

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

wind farms in Rhode Island
Block Island Wind FarmOffshore Wind TurbineDeepwater Wind Block Island LLCWashington3012016Operating
WED Coventry 2Onshore Wind TurbineWED Coventry Two, LLCKent4.532016Operating
WED Coventry 6Onshore Wind TurbineGreenbacker Renewable Energy CorporationKent4.532016Operating
NBC Field's Point Wind FarmOnshore Wind TurbineNarragansett Bay CommissionProvidence4.512012Operating
WED Green Hill, LLCOnshore Wind TurbineWED Green Hill, LLCProvidence312019Operating
WED Plainfield II, LLCOnshore Wind TurbineWED Plainfield II, LLCProvidence312019Operating
WED Plainfield III, LLCOnshore Wind TurbineWED Plainfield III, LLCProvidence312019Operating
WED Plainfield, LLCOnshore Wind TurbineWED Plainfield, LLCProvidence312019Operating
WED Shun I, LLCOnshore Wind TurbineWED Shun I, LLCProvidence312019Operating
WED Shun II, LLCOnshore Wind TurbineWED Shun II, LLCProvidence312019Operating
WED Shun III, LLCOnshore Wind TurbineWED Shun III, LLCProvidence312019Operating
Green Providence Wind II, LLCOnshore Wind TurbineGreen Providence Wind II, LLCProvidence312021Operating
WED NK GreenOnshore Wind TurbineWED NK Green LLCWashington1.512012Operating
WED Coventry 1Onshore Wind TurbineWED Coventry One, LLCKent1.512016Operating
WED Coventry 3Onshore Wind TurbineWED Coventry Three, LLCKent1.512016Operating
WED Coventry 4Onshore Wind TurbineWED Coventry Four, LLCKent1.512016Operating
WED Coventry 5Onshore Wind TurbineGreenbacker Renewable Energy CorporationKent1.512017Operating
WED Portsmouth One, LLCOnshore Wind TurbineGreenbacker Renewable Energy CorporationNewport1.512016Operating
Green Providence Wind I, LLCOnshore Wind TurbineGreen Providence Wind I, LLCProvidence1.512021Operating

Largest wind farms in Rhode Island

  1. 1Block Island Wind FarmWashington County, Rhode Island30 MW
  2. 2WED Coventry 2Kent County, Rhode Island4.5 MW
  3. 3WED Coventry 6Kent County, Rhode Island4.5 MW
  4. 4NBC Field's Point Wind FarmProvidence County, Rhode Island4.5 MW
  5. 5WED Green Hill, LLCProvidence County, Rhode Island3 MW
  6. 6WED Plainfield II, LLCProvidence County, Rhode Island3 MW
  7. 7WED Plainfield III, LLCProvidence County, Rhode Island3 MW
  8. 8WED Plainfield, LLCProvidence County, Rhode Island3 MW
  9. 9WED Shun I, LLCProvidence County, Rhode Island3 MW
  10. 10WED Shun II, LLCProvidence County, Rhode Island3 MW

Wind farms by county in Rhode Island

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Washington231.5
Providence1030
Kent615
Newport11.5

Wind Farms in Rhode Island: FAQ

How many wind farms are in Rhode Island?
19, with 78 MW of nameplate capacity between them, spread over 4 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Rhode Island wind farms?
Yes — the map above. Each dot is one wind farm, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest wind farm in Rhode Island?
Block Island Wind Farm, at 30 MW. The table is sorted largest first, so the rest follow it.
Is there a wind farm near me in Rhode Island?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Rhode Island's wind farms?
Most of them sit inside ISO New England, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. Onshore and offshore wind turbines. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.