WED Coventry 4

WED Coventry 4 is a 2 MW wind farm in Kent County, Rhode Island, operated by WED Coventry Four, LLC. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2016.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.5 MW
1.5 MW net summer
Generating units
1
In service
2016
EIA plant ID
59306

Where it is

Loading map…
County
Kent County, Rhode Island
Coordinates
41.6864, -71.7283
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
WED Coventry Four, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant WED Coventry Four, LLC reports to EIA →

WED Coventry 4: FAQ

Where is WED Coventry 4?
In Kent County, Rhode Island (RI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is WED Coventry 4?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns WED Coventry 4?
EIA-860M names WED Coventry Four, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as WED Coventry 4 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — WED Coventry Four, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "WED Coventry 4 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is WED Coventry 4 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.