Big Spring Wind Power Facility

Big Spring Wind Power Facility is a 34 MW wind farm in Howard County, Texas, operated by Terra-Gen Operating Co-Wind. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 1998.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
34.3 MW
34.3 MW net summer
Generating units
1
In service
1998
EIA plant ID
54979

Where it is

Loading map…
County
Howard County, Texas
Coordinates
32.2075, -101.3883
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Terra-Gen Operating Co-Wind
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Terra-Gen Operating Co-Wind reports to EIA →

Big Spring Wind Power Facility: FAQ

Where is Big Spring Wind Power Facility?
In Howard County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Big Spring Wind Power Facility?
34 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Big Spring Wind Power Facility?
EIA-860M names Terra-Gen Operating Co-Wind as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Big Spring Wind Power Facility LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Terra-Gen Operating Co-Wind here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Big Spring Wind Power Facility LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Big Spring Wind Power Facility still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.