Buffalo Gap Wind Farm

Buffalo Gap Wind Farm is a 121 MW wind farm in Taylor County, Texas, operated by AES Distributed Energy. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2006.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
120.6 MW
120.6 MW net summer
Generating units
1
In service
2006
Plant code
56240

Where it is

Loading map…
County
Taylor County, Texas
Coordinates
32.3116, -100.0616
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant operated by AES Distributed Energy →

Buffalo Gap Wind Farm: FAQ

Where is Buffalo Gap Wind Farm?
In Taylor County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Buffalo Gap Wind Farm?
121 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Buffalo Gap Wind Farm?
AES Distributed Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Buffalo Gap Wind Farm LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Buffalo Gap Wind Farm LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Buffalo Gap Wind Farm still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.