Callahan Divide Wind Energy Center

Callahan Divide Wind Energy Center is a 114 MW wind farm in Taylor County, Texas, operated by FPL Energy Callahan Wind, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2005.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
114 MW
114 MW net summer
Generating units
1
In service
2005
Plant code
56270

Where it is

Loading map…
County
Taylor County, Texas
Coordinates
32.3039, -100.0217
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
FPL Energy Callahan Wind, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Callahan Divide Wind Energy Center: FAQ

Where is Callahan Divide Wind Energy Center?
In Taylor County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Callahan Divide Wind Energy Center?
114 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Callahan Divide Wind Energy Center?
FPL Energy Callahan Wind, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Callahan Divide Wind Energy Center LLC?
Probably, but the plant data does not say. It records a plant name and an operator — FPL Energy Callahan Wind, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Callahan Divide Wind Energy Center LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Callahan Divide Wind Energy Center still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.