Buffalo Gap 2 Wind Farm
Buffalo Gap 2 Wind Farm is a 233 MW wind farm in Nolan County, Texas, operated by AES Distributed Energy. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2007.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 232.5 MW
- 232.5 MW net summer
- Generating units
- 1
- In service
- 2007
- Plant code
- 56484
Where it is
Loading map…
- County
- Nolan County, Texas
- Coordinates
- 32.3182, -100.177
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- AES Distributed Energy
- Primary energy source
- Wind
- Technologies
- Onshore Wind Turbine
- Status
- Operating
Buffalo Gap 2 Wind Farm: FAQ
- Where is Buffalo Gap 2 Wind Farm?
- In Nolan County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Buffalo Gap 2 Wind Farm?
- 233 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Buffalo Gap 2 Wind Farm?
- AES Distributed Energy is the operator of record. That is not always the ultimate owner.
- Is this the same as Buffalo Gap 2 Wind Farm LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Buffalo Gap 2 Wind Farm LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Buffalo Gap 2 Wind Farm still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.