Silver Star I Wind Power Project

Silver Star I Wind Power Project is a 53 MW wind farm in Erath County, Texas, operated by Silver Star I Power Partners LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2008.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
52.8 MW
52.8 MW net summer
Generating units
1
In service
2008
Plant code
56771

Where it is

Loading map…
County
Erath County, Texas
Coordinates
32.3387, -98.476
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Silver Star I Power Partners LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Silver Star I Wind Power Project: FAQ

Where is Silver Star I Wind Power Project?
In Erath County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Silver Star I Wind Power Project?
53 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Silver Star I Wind Power Project?
Silver Star I Power Partners LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Silver Star I Wind Power Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Silver Star I Power Partners LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver Star I Wind Power Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Silver Star I Wind Power Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.