Longhorn Wind

Longhorn Wind is a 200 MW wind farm in Briscoe County, Texas, operated by Boralex US Operations LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
200 MW
200 MW net summer
Generating units
1
In service
2015
EIA plant ID
58772

Where it is

Loading map…
County
Briscoe County, Texas
Coordinates
34.3111, -101.2511
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Boralex US Operations LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Boralex US Operations LLC reports to EIA →

Longhorn Wind: FAQ

Where is Longhorn Wind?
In Briscoe County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Longhorn Wind?
200 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Longhorn Wind?
EIA-860M names Boralex US Operations LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Longhorn Wind LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Boralex US Operations LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Longhorn Wind LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Longhorn Wind still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.