Longhorn Wind

Longhorn Wind is a 200 MW wind farm in Briscoe County, Texas, operated by Boralex US Operations LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2015.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
200 MW
200 MW net summer
Generating units
1
In service
2015
Plant code
58772

Where it is

Loading map…
County
Briscoe County, Texas
Coordinates
34.3111, -101.2511
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Boralex US Operations LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant operated by Boralex US Operations LLC →

Longhorn Wind: FAQ

Where is Longhorn Wind?
In Briscoe County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Longhorn Wind?
200 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Longhorn Wind?
Boralex US Operations LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Longhorn Wind LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Boralex US Operations LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Longhorn Wind LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Longhorn Wind still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.