Spinning Spur Wind III

Spinning Spur Wind III is a 194 MW wind farm in Oldham County, Texas, operated by Boralex US Operations LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
194 MW
194 MW net summer
Generating units
1
In service
2015
EIA plant ID
58775

Where it is

Loading map…
County
Oldham County, Texas
Coordinates
35.295, -102.7211
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Boralex US Operations LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Boralex US Operations LLC reports to EIA →

Spinning Spur Wind III: FAQ

Where is Spinning Spur Wind III?
In Oldham County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Spinning Spur Wind III?
194 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Spinning Spur Wind III?
EIA-860M names Boralex US Operations LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Spinning Spur Wind III LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Boralex US Operations LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Spinning Spur Wind III LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Spinning Spur Wind III still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.