Bearkat

Bearkat is a 197 MW wind farm in Glasscock County, Texas, operated by Bearkat Wind Energy 1, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
196.7 MW
196.7 MW net summer
Generating units
1
In service
2018
EIA plant ID
59972

Where it is

Loading map…
County
Glasscock County, Texas
Coordinates
31.7272, -101.582
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Bearkat Wind Energy 1, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Bearkat Wind Energy 1, LLC reports to EIA →

Bearkat: FAQ

Where is Bearkat?
In Glasscock County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Bearkat?
197 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Bearkat?
EIA-860M names Bearkat Wind Energy 1, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Bearkat LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Bearkat Wind Energy 1, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Bearkat LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Bearkat still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.