Javelina Wind Energy II, LLC

Javelina Wind Energy II, LLC is a 200 MW wind farm in Webb County, Texas, operated by Javelina Wind Energy II, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2016.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
200 MW
200 MW net summer
Generating units
1
In service
2016
Plant code
60645

Where it is

Loading map…
County
Webb County, Texas
Coordinates
27.44, -98.91
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Javelina Wind Energy II, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Javelina Wind Energy II, LLC: FAQ

Where is Javelina Wind Energy II, LLC?
In Webb County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Javelina Wind Energy II, LLC?
200 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Javelina Wind Energy II, LLC?
Javelina Wind Energy II, LLC is the operator of record. That is not always the ultimate owner.
Is Javelina Wind Energy II, LLC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.