Blue Summit II Wind

Blue Summit II Wind is a 99 MW wind farm in Wilbarger County, Texas, operated by Blue Summit II Wind, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
99.4 MW
99.4 MW net summer
Generating units
1
In service
2019
EIA plant ID
61970

Where it is

Loading map…
County
Wilbarger County, Texas
Coordinates
34.2259, -99.478
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Blue Summit II Wind, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Blue Summit II Wind, LLC reports to EIA →

Blue Summit II Wind: FAQ

Where is Blue Summit II Wind?
In Wilbarger County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Blue Summit II Wind?
99 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Blue Summit II Wind?
EIA-860M names Blue Summit II Wind, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Blue Summit II Wind LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Blue Summit II Wind, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Blue Summit II Wind LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Blue Summit II Wind still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.