Reloj del Sol Wind Farm

Reloj del Sol Wind Farm is a 209 MW wind farm in Zapata County, Texas, operated by Reloj del Sol Wind Farm LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
209.4 MW
209.4 MW net summer
Generating units
1
In service
2021
Plant code
62207

Where it is

Loading map…
County
Zapata County, Texas
Coordinates
27.0303, -99.3884
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Reloj del Sol Wind Farm LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Reloj del Sol Wind Farm: FAQ

Where is Reloj del Sol Wind Farm?
In Zapata County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Reloj del Sol Wind Farm?
209 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Reloj del Sol Wind Farm?
Reloj del Sol Wind Farm LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Reloj del Sol Wind Farm LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Reloj del Sol Wind Farm LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Reloj del Sol Wind Farm LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Reloj del Sol Wind Farm still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.