Mesquite Star

Mesquite Star is a 419 MW wind farm in Nolan County, Texas, operated by Mesquite Star Special LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
418.9 MW
418.9 MW net summer
Generating units
1
In service
2020
EIA plant ID
62587

Where it is

Loading map…
County
Nolan County, Texas
Coordinates
32.256, -100.3203
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Mesquite Star Special LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Mesquite Star Special LLC reports to EIA →

Mesquite Star: FAQ

Where is Mesquite Star?
In Nolan County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Mesquite Star?
419 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Mesquite Star?
EIA-860M names Mesquite Star Special LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Mesquite Star LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Mesquite Star Special LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Mesquite Star LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Mesquite Star still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.