Hart Wind

Hart Wind is a 166 MW wind farm in Castro County, Texas, operated by Hart Wind Project, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
166.4 MW
166.4 MW net summer
Generating units
1
In service
2025
EIA plant ID
67763

Where it is

Loading map…
County
Castro County, Texas
Coordinates
34.3785, -102.0537
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Hart Wind Project, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Hart Wind Project, LLC reports to EIA →

Hart Wind: FAQ

Where is Hart Wind?
In Castro County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Hart Wind?
166 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Hart Wind?
EIA-860M names Hart Wind Project, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Hart Wind LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Hart Wind Project, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hart Wind LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Hart Wind still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.